Synchronization Requirements for Fronthaul

For 5G networks, the basic synchronization requirements haven’t changed. For FDD networks (Frequency Division Duplexing), the carrier frequency must be within 50 ppb (parts per billion) of the allocated frequency, while for TDD (Time Division Duplexing), basestations must be synchronized to within 3 microseconds of each other, or to within 1.5 microseconds of a central time reference.

However, that’s not the whole story. There are several radio techniques being proposed for 5G that require much tighter synchronization between local RRUs. One example is inter-site carrier aggregation. This is the ability to bond two separate carrier frequencies together to form a large, high-bandwidth pipe. Carrier aggregation was used extensively by 4G operators to increase data rates to consumers, but the two carrier frequencies were transmitted from the same antenna. For 5G, that might not always be the case – the carriers may be transmitted from separate RRUs. This means the RRUs must be synchronized to within 260ns of each other.

Another example being discussed is MIMO. This uses multiple antennas, normally connected to the same RRU. However, there are proposals in 5G to allow MIMO to be used across different RRUs. This requires even tighter synchronization of less than 65ns difference between RRUs.

Clearly, these techniques require extremely high accuracy from the synchronization network. However, the distinguishing feature is that these are DU functions, therefore the tight synchronization is only required in a cluster consisting of the DU with its connected RRUs. This is shown in the diagram below:

So does that mean operators can simply provide tight synchronization in the small cluster region? Not true according to some operators. They also have to take into account failure conditions and network changes. Networks don’t stay the same for long, they change topology over time, whether through equipment failures or planned additions or re-configurations. This means it can be hard to keep track of the synchronization relationships between elements.

For example, DUs can be multi-homed, meaning they can connect to more than one CU for protection purposes. Similarly, it may not always be clear which DU an RRU is connected to. Therefore some operators have stated that they want the cluster limit to apply to the entire network. That way they are certain that whatever network changes or re-configurations occur, the synchronization requirements are always met.

Tim Frost
Strategic Technology Manager, Calnex Solutions.

Recent Blogs

Related Blogs

banana skin

Will SD-WAN really be the savior?

Mar 13, 2019
The only way to prove it is to get validation on how it will perform against your needs…
1692 Read more
Four Boardroom Members

How to Optimise Your IT Network and Spend

Feb 06, 2019
Network emulation can be a key tool to overcome barriers in getting the most out of your…
2708 Read more

Responding to IT Network Issues

Jan 22, 2019
If simple remedial scripts are not enough to fix an IT network issue, a more…
3816 Read more

Archived Blogs

989 More

Timing not Telecoms

Nov 08, 2016
666 More

5G Coming Soon

Aug 22, 2016
675 More

What is 1588 PTP?

Aug 04, 2016
798 More

5G on the Horizon

Aug 01, 2016
674 More
707 More

What is a PTP Clock?

Apr 09, 2016
829 More

What is Time Error?

Oct 21, 2015
682 More

LTE-A & VoLTE Rollout

Sep 22, 2015
660 More

LTE Picks Up Speed

Aug 22, 2015
647 More

What is the Time?

Aug 22, 2015
650 More

Mobile and Sync

Aug 22, 2015
633 More

What is SyncE?

Aug 22, 2015
1232 More
718 More

Microwave Update

Aug 22, 2015
720 More

Unravelling Standards

Aug 22, 2015
697 More

Partial Progress?

Aug 22, 2015
655 More

Interpreting ITU

Aug 22, 2015
641 More

Confusion Rules!

Aug 22, 2015
662 More

Basestations Need Sync

Aug 22, 2015
668 More

ITSF 2015 Edinburgh

Aug 22, 2015
631 More

India to Follow China?

Aug 07, 2015
654 More
HOW CAN CALNEX HELP YOU FURTHER?

Click your area of interest below for more tutorials and real-world case studies.